30 Avenue | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
New York City Subway station (rapid transit) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Station statistics | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Address | 30th Avenue & 31st Street Astoria, New York | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Borough | Queens | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Astoria | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Coordinates | 40°46′01″N 73°55′17″W / 40.766859°N 73.921423°W | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Division | B (BMT)[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line | BMT Astoria Line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | N (all times) W (weekdays) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Transit | MTA Bus: Q18, Q102 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Structure | Elevated | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Platforms | 2 side platforms | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tracks | 3 (2 in regular service) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other information | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | February 1, 1917 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Closed | October 23, 2017 | (reconstruction)|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rebuilt | June 22, 2018 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opposite- direction transfer | Yes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Former/other names | 30th Avenue–Grand Avenue | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Traffic | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2023 | 3,015,519[2] 14.5% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rank | 107 out of 423[2] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The 30th Avenue station (formerly 30th Avenue–Grand Avenue station) is a local station on the BMT Astoria Line of the New York City Subway. It is located at 30th Avenue and 31st Street in Astoria. The station is served by the N train at all times, as well as by the W train on weekdays.
History
This station opened on February 1, 1917, along with the rest of the Astoria Line, which was originally part of the IRT, as a spur off the IRT Queensboro Line, which is now the IRT Flushing Line. Trains ran between Grand Central and Astoria.[3][4] On July 23, 1917, the Queensboro Bridge spur of the elevated IRT Second Avenue Line opened. At that time, all elevated trains to Queensboro Plaza used the Astoria Line while all subway trains used the IRT Flushing Line, though this was later changed with trains alternating between branches.[4][5] This station started to be served by BMT shuttles using elevated cars on April 8, 1923.[6]
The city government took over the BMT's operations on June 1, 1940,[7][8] and the IRT's operations on June 12, 1940.[9][10] On October 17, 1949, the Astoria Line became BMT-only as the tracks at Queensboro Plaza were consolidated and the platforms on the Astoria Line were shaved back to allow BMT trains to operate on it. Service was initially provided by the Brighton Local (BMT 1) and the Broadway–Fourth Avenue Local (BMT 2) at all times.[11]
Station renovations
The platforms at this station, along with six others on the Astoria Line, were lengthened to 610 feet (190 m) to accommodate ten-car trains in 1950.[12]: 23 The project cost $863,000. Signals on the line had to be modified to take the platform extensions into account.[13]: 633, 729
Under the 2015–2019 MTA Capital Plan, the station underwent a complete overhaul as part of the Enhanced Station Initiative and was entirely closed for several months. Updates included cellular service, Wi-Fi, USB charging stations, interactive service advisories and maps.[14][15] The award for Package 2 of the renovations, which covered renovations at the 30th Avenue, Broadway, 36th Avenue, and 39th Avenue stations, was awarded on April 14, 2017, to Skanska USA.[16] This station, along with 36th Avenue, was closed entirely for around eight months starting on October 23, 2017.[17] After the 30th Avenue and 36th Avenue stations closed, there was some controversy over the loss of business near these stations.[18] The stations reopened on June 22, 2018.[19] In July 2018, the MTA retroactively awarded a contract for the additional platform and girder repairs at the 30th and 36th Avenues stations, conducted after the stations had reopened.[20]
Station layout
Platforms | Side platform, doors will open on the right | |
Southbound local | ← toward Coney Island–Stillwell Avenue (Broadway) ← toward Whitehall Street–South Ferry weekdays (Broadway) | |
Peak-direction express | ← No regular service | |
Northbound local | → ( weekdays) toward Astoria–Ditmars Boulevard (Astoria Boulevard) → | |
Side platform, doors will open on the right | ||
Mezzanine | To entrances/exits, station agent, MetroCard and OMNY vending machines | |
Ground | Street level | Entrances/exits |
This elevated station has two side platforms and three tracks. The center track is not used in revenue service, but it had been used regularly as recently as 2002.[21]
The platforms are narrower at their south ends. The ends of each platform contain full-height mesh windscreens, while the center of the platform contains glass windscreens and black metal canopies. Prior to the 2018 renovations, both platforms had creme-colored corrugated windscreens for their entire lengths and red wooden canopies at the platforms' centers.[22]
As part of the MTA Arts & Design program, Stephen Westfall created an artwork for the station, titled Perasma I and II; Dappleganger, which was installed in 2018.[23][24] The artwork consists of 47 laminated glass panels in the mezzanine, each with geometric designs. According to the MTA, the panels were intended to "rhythmically invoke universality alongside cultural identity".[24]
Exits
This station's only mezzanine is an elevated wooden station house beneath the center of the platforms and tracks. It has a turnstile bank and two staircases for each platform. A crossunder is behind the token booth on the north side. A passageway on each side behind the platform stairs leads to a staircase going down to either southern corners of 31st Street and 30th Avenue. Two staircases on the other side go down to the northern corners.[22][25][26] An exit-only stair from the northbound platform descends to the southeastern corner of Newtown Avenue and 31st Street.
References
- ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
- ^ a b "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
- ^ "First Train Runs On Elevated Line to Astoria Section". Brooklyn Daily Eagle. February 1, 1917. Retrieved June 29, 2015 – via Newspapers.com.
- ^ a b Annual report. 1916-1917. New York: Interborough Rapid Transit Company. 1917. pp. 15–16 – via HathiTrust.
- ^ "Subway Link Over Queensboro Bridge". The New York Times. July 22, 1917. p. 31. Retrieved December 18, 2011.
- ^ "Additional Subway Service to Borough of Queens". The New York Times. April 8, 1923. p. RE1. Retrieved December 18, 2011.
- ^ "B.M.T. Lines Pass to City Ownership; $175,000,000 Deal Completed at City Hall Ceremony-- Mayor 'Motorman No. 1'". The New York Times. June 2, 1940. ISSN 0362-4331. Archived from the original on July 19, 2021. Retrieved May 14, 2022.
- ^ "City Takes Over B. M. T. System; Mayor Skippers Midnight Train". New York Herald Tribune. June 2, 1940. p. 1. ProQuest 1243059209.
- ^ "City Transit Unity Is Now a Reality; Title to I.R.T. Lines Passes to Municipality, Ending 19-Year Campaign". The New York Times. June 13, 1940. ISSN 0362-4331. Archived from the original on January 7, 2022. Retrieved May 14, 2022.
- ^ "Transit Unification Completed As City Takes Over I. R. T. Lines: Systems Come Under Single Control After Efforts Begun in 1921; Mayor Is Jubilant at City Hall Ceremony Recalling 1904 Celebration". New York Herald Tribune. June 13, 1940. p. 25. ProQuest 1248134780.
- ^ "Direct Subway Runs to Flushing, Astoria". The New York Times. October 15, 1949. p. 17. Retrieved December 18, 2011.
- ^ General Contractors Association (1950). Bulletin. New York.
{{cite book}}
: CS1 maint: location missing publisher (link) - ^ Board of Transportation of the City of New York (1950). Proceedings of the Board of Transportation of the City of New York. New York.
{{cite book}}
: CS1 maint: location missing publisher (link) - ^ Whitford, Emma (January 8, 2016). "MTA Will Completely Close 30 Subway Stations For Months-Long "Revamp"". Gothamist. Archived from the original on March 23, 2020. Retrieved July 18, 2016.
- ^ "MTA Stations" (PDF). governor.ny.gov. Government of the State of New York. Archived (PDF) from the original on November 2, 2019. Retrieved July 18, 2016.
- ^ Capital Program Oversight Committee Meeting (PDF). mta.info (Report). Metropolitan Transportation Authority. April 24, 2017. p. 17. Archived (PDF) from the original on August 20, 2020. Retrieved April 24, 2017.
- ^ Evelly, Jeanmarie (September 14, 2017). "2 Astoria Subway Stations to Close for 8 Months on Oct. 23, MTA Says". DNAinfo New York. Archived from the original on September 15, 2017. Retrieved September 15, 2017.
- ^ Law, Tara (May 22, 2018). "MTA: 30th and 36th Avenue Subway Stations on Schedule to Reopen Late June". Astoria Post. Archived from the original on September 24, 2020. Retrieved June 4, 2018.
- ^ "Broadway & 39 Av NW Stations to Undergo Extensive Repairs & Renovations" (Press release). Metropolitan Transportation Authority. June 8, 2018. Archived from the original on September 24, 2020. Retrieved June 8, 2018.
- ^ Transit & Bus Committee Meeting (PDF) (Report). Metropolitan Transportation Authority. July 23, 2018. pp. 194–195. Archived from the original (PDF) on September 24, 2020. Retrieved July 23, 2018.
- ^ "BMT Astoria Line". www.nycsubway.org. Retrieved February 19, 2016.
- ^ a b Cox, Jeremiah. "30 Avenue-Grand Avenue (N,Q) - The SubwayNut". www.subwaynut.com. Archived from the original on July 6, 2020. Retrieved February 19, 2016.
- ^ Cook, Lauren; Desai, Rajvi (June 22, 2018). "Astoria subway stations at 30th, 36th avenues reopen after 8-month renovation". am New York. Archived from the original on September 24, 2020. Retrieved June 25, 2018.
- ^ a b "Perasma I & II; Dappleganger". MTA. Retrieved May 31, 2024.
- ^ "N Train". stationreporter.net. February 4, 2012. Archived from the original on February 4, 2012. Retrieved February 19, 2016.
- ^ "MTA Neighborhood Maps: Astoria" (PDF). Metropolitan Transportation Authority. 2015. Retrieved September 27, 2015.
External links
- Media related to 30th Avenue (BMT Astoria Line) at Wikimedia Commons
- 30th Avenue entrance from Google Maps Street View
- Platforms from Google Maps Street View