Epstein Files Full PDF

CLICK HERE
Technopedia Center
PMB University Brochure
Faculty of Engineering and Computer Science
S1 Informatics S1 Information Systems S1 Information Technology S1 Computer Engineering S1 Electrical Engineering S1 Civil Engineering

faculty of Economics and Business
S1 Management S1 Accountancy

Faculty of Letters and Educational Sciences
S1 English literature S1 English language education S1 Mathematics education S1 Sports Education
teknopedia

  • Registerasi
  • Brosur UTI
  • Kip Scholarship Information
  • Performance
Flag Counter
  1. World Encyclopedia
  2. Prototype Fast Breeder Reactor - Wikipedia
Prototype Fast Breeder Reactor - Wikipedia
Coordinates: 12°33′11″N 80°10′24″E / 12.55306°N 80.17333°E / 12.55306; 80.17333
From Wikipedia, the free encyclopedia
Indian fast breeder nuclear reactor design

PFBR
GenerationPrototype
Reactor conceptSodium-cooled fast reactor
Reactor lineIFBR (Indian fast-breeder Reactor)
Designed byIGCAR
Manufactured byBHAVINI
StatusCompleted[1]
Main parameters of the reactor core
Fuel (fissile material)Plutonium/235U[2]
Fuel stateSolid
Neutron energy spectrumFast
Primary control methodControl rods
Primary coolantLiquid sodium
Reactor usage
Primary useBreeding of 233U for AHWR-300 and generation of electricity
Power (thermal)1253
Power (electric)500
Prototype Fast Breeder Reactor
Map
CountryIndia
LocationKalpakkam, Tamil Nadu.
Coordinates12°33′11″N 80°10′24″E / 12.55306°N 80.17333°E / 12.55306; 80.17333
StatusUnder construction
Construction began2004
Commission dateDecember 2025 (planned)
Construction cost₹5,850 crore (equivalent to ₹220 billion or US$2.54 billion in 2023)[3]
OwnerBHAVINI
OperatorBHAVINI
Nuclear power station
Reactor typeFast breeder
Cooling source
    • Sodium
Power generation
Nameplate capacity500 MW
[edit on Wikidata]

The Prototype Fast Breeder Reactor (PFBR) is a 500 MWe sodium-cooled, fast breeder reactor that is being constructed at the same site as the Madras Atomic Power Station in Kokkilamedu, near Kalpakkam, in Tamil Nadu state, India.[4] The Indira Gandhi Centre for Atomic Research (IGCAR) is responsible for the design of this reactor, the Advanced Fuel Fabrication Facility at the affiliated campus of Bhabha Atomic Research Centre in Tarapur is responsible for MOX fuel fabrication and BHEL is providing technology and equipment for construction of the reactor.[5][6] The facility builds on the decades of experience gained from operating the lower power KAMINI[7] and Fast Breeder Test Reactor (FBTR). At first, the reactor's construction was supposed to be completed in September 2010, but there were several delays. The Prototype Fast Breeder Reactor is scheduled to be put into service in December 2024,[8] which is more than 20 years after construction began and 14 years after the original commissioning date, as of December 2023. The project's cost has doubled from ₹3,500 crore to ₹7,700 crore due to the multiple delays. The construction was completed on 4th March 2024 with commencement of core loading of the reactor hence paving the way for the eventual full utilization of India’s abundant thorium reserves.[9][10] But new technical issues crept up, after solving those, the AERB cleared BHAVINI to commence final fuel loading which began on 18 October, 2025. The reactor is expected to achieve first criticality within 6 months and commercial operations will begin by September, 2026.[11]

Background

[edit]

The Kalpakkam PFBR is designed to use uranium-238 to breed plutonium in a sodium-cooled fast reactor design. The use of thorium-232, which in itself is not a fissile material, as a blanket is also envisaged in this stage. By transmutation, thorium will create fissile uranium-233 which will be used as fuel in the third stage. FBR is thus a stepping stone for the third stage of the program paving the way for the eventual full utilization of India's abundant thorium reserves.[9][12] The surplus plutonium (or uranium-233 for thorium reactors) from each fast reactor can be used to set up more such reactors and grow the nuclear capacity in tune with India's needs for power. The PFBR is a part of the three-stage nuclear power program.

PFBR, with closed fuel cycle as the energy resource, is capable of generating a large amount of U-233 (a fissile isotope) from the abundant available thorium-232 within the country, to launch the third stage nuclear energy programme based on U-233 fuel cycle.[13]

The fuel for the PFBR will initially be Uranium-Plutonium mixed oxide (MOX).[14]

India has the capability to use thorium cycle based processes to extract nuclear fuel. This is of special significance to the Indian nuclear power generation strategy as India has one of the world's largest reserves of thorium, which could provide power for perhaps as long as 60,000 years.[15][16]

Design and construction

[edit]

The design of this reactor was started in the 1980s, as a prototype for a 600 MW FBR. Construction of the first two FBR are planned at Kalpakkam, after a year of successful operation of the PFBR. Other four FBR are planned to follow beyond 2030, at sites to be defined.[17]

In 2007, the reactor was planned to begin its operation in 2010, but as of 2019, it was expected to reach first criticality in 2020.[18]

In July 2017, it was reported that the reactor is in final preparation to go critical.[19] However in August 2020, it was reported that the reactor might go critical only in December 2021.[20] By February 2021, around ₹6,840 crore (equivalent to ₹77 billion or US$907.84 million in 2023) have been spent in the construction and commissioning of the reactor. The reactor was expected to be operational by October 2022.[3][21]

Prime Minister Narendra Modi was in Kalpakkam on 4 March 2024 to witness the initiation of its first core loading. A press release described the PFBR as marking the second stage of India's three-stage nuclear power program.[22]

On 31 July 2024, the Atomic Energy Regulatory Board (AERB) approved adding nuclear fuel and starting the chain reaction.[23] It is expected to be operational by end of 2025.[24] A few lower power physics experiments will be carried out once sustained nuclear chain reaction is achieved. The next step will link the reactor to electrical grid and start producing power on a commercial basis, pending approval from AERB. Kalpakkam will see the construction of two more fast breeder reactors after the Department of Atomic Energy (DAE) is satisfied with the reactor's performance.[25]

Technical details

[edit]
Schematic diagram showing the difference between the loop and pool designs of a liquid metal fast breeder reactor. The pool-type has greater thermal inertia to changes in temperature, which therefore gives more time to shut down/SCRAM during a loss of coolant accident situation.

The reactor is a pool type LMFBR with 1,750 tonnes of sodium as coolant. Designed to generate 500 MWe of electrical power, with an operational life of 40 years, it will burn a mixed uranium-plutonium MOX fuel, a mixture of PuO
2
and UO
2
. A fuel burnup of 100 GWd/t is expected. The Fuel Fabrication Facility (FFF), under the direction of Bhabha Atomic Research Centre (BARC), Tarapur is responsible for the fuel rods manufacturing. FFF comes under "Nuclear Recycle Board" of Bhabha Atomic Research Center and has been responsible for fuel rod manufacturing of various types in the past.[citation needed] FFF Tarapur in early 2023 had successfully completed fabrication of 100,000 PFBR fuel elements.[clarification needed][26]

Safety considerations

[edit]

The prototype fast breeder reactor has a negative void coefficient, thus ensuring a high level of passive nuclear safety. This means that when the reactor overheats (above the boiling point of sodium) the speed of the fission chain reaction decreases, lowering the power level and the temperature.[27] Similarly, before such a potential positive void condition may form from a complete loss of coolant accident, sufficient coolant flow rates are made possible by the use of conventional pump inertia, alongside multiple inlet-perforations, to prevent the possible accident scenario of a single blockage halting coolant flow.[27]

The active-safety reactor decay heat removal system consists of four independent coolant circuits of 8MWt capacity each.[28] Further active defenses against the positive feedback possibility include two independent SCRAM shutdown systems, designed to shut the fission reactions down effectively within a second, with the remaining decay heat then needing to be cooled for a number of hours by the four independent circuits.

The fact that the PFBR is cooled by liquid sodium creates additional safety requirements to isolate the coolant from the environment, especially in a loss of coolant accident scenario, since sodium explodes if it comes into contact with water and burns when in contact with air. This latter event occurred in the Monju reactor in Japan in 1995. Another consideration with the use of sodium as a coolant is the absorption of neutrons to generate the radioactive isotope 24
Na
, which has a 15-hour half life.[29]

See also

[edit]
  • FBR-600 - commercial variant of the PFBR design
  • India's three stage nuclear power programme

References

[edit]
  1. ^ "Why is India's first indigenous Fast Breeder Reactor significant?". 5 March 2024.
  2. ^ "India's Most Advanced Nuclear Reactor Approaches Finish Line".
  3. ^ a b "Lok Sabha Unstarred Question No. 330, Budget Session 2021" (PDF). Department of Atomic Energy, Government of India. 3 February 2021. Retrieved 18 April 2021.
  4. ^ Baldev Raj, S.C. Chetal and P. Chellapandi (8 January 2010). "Great expectations". Nuclear Engineering International.
  5. ^ "BHEL achieves breakthrough in the Nuclear Power segment; Wins order for new rating, indigenously-developed 700 MWe Nuclear Sets based on Pressurised Heavy Water Reactors | Official Website of Bharat Heavy Electricals Limited, New Delhi, India". www.bhel.com. Retrieved 15 May 2024.
  6. ^ "Technological developments in safe and efficient fabrication of fast reactor fuel elements" (PDF). inis.iaea.org.
  7. ^ "Fifteen Years of Operating Experience of KAMINI Reactor" (PDF). Archived from the original (PDF) on 9 March 2017.
  8. ^ Srinivas Laxman (18 September 2024). "Indigenous fast breeder reactor set to become critical: AEC chief". The Times of India. Retrieved 17 November 2024.{{cite web}}: CS1 maint: deprecated archival service (link)
  9. ^ a b "PM witnesses the historic "Commencement of Core Loading" at India's first indigenous Fast Breeder Reactor (500 MWe) at Kalpakkam, Tamil Nadu". Department of Atomic Energy. 4 March 2024. Retrieved 30 July 2025.
  10. ^ "How India's beaches can unlock a nuclear-powered future". www.downtoearth.org.in. 16 April 2024. Retrieved 15 May 2024.
  11. ^ https://www.deccanherald.com/india/fast-breeder-reactor-to-become-operational-by-september-2026-3490388
  12. ^ "PM watches core loading of first indigenous fast breeder reactor". The Times of India. 5 March 2024. ISSN 0971-8257. Retrieved 15 May 2024.
  13. ^ "Explained | Prototype Fast Breeder Reactor (PFBR)". Onmanorama. Retrieved 15 May 2024.
  14. ^ Bagla, Pallava (30 July 2024). "India's Most Advanced Nuclear Reactor Approaches Finish Line". NDTV.com. Retrieved 1 August 2024.
  15. ^ MacKay, David J. C. (20 February 2009). Sustainable Energy - Without the Hot Air. UIT Cambridge Ltd. p. 166. Retrieved 23 March 2012.
  16. ^ Rodricks, Dan (9 May 2011). "Thor's nuclear-powered hammer". The Baltimore Sun. Retrieved 23 March 2012.
  17. ^ "India plans to construct six more fast breeder reactors". The Economic Times. 1 December 2015. Archived from the original on 22 December 2015. Retrieved 15 December 2015.
  18. ^ "Prototype Fast Breeder Reactor at Kalpakkam in integrated commissioning stage". THEWEEK. 15 December 2021.
  19. ^ "Nuclear reactor at Kalpakkam: World's envy, India's pride". The Times of India. 26 November 2017. Retrieved 2 July 2017.
  20. ^ "India's First Prototype Fast Breeder Reactor Has a New Deadline. Should We Trust It?".
  21. ^ "Prototype Fast Breeder Reactor at Kalpakkam in integrated commissioning stage". The Week.
  22. ^ "Core loading of India's 1st indigenous nuclear reactor in Kalpakkam on Monday". The New Indian Express. 4 March 2024. Retrieved 4 March 2024.
  23. ^ Singh, Surendra (31 July 2024). "India's most advanced fast breeder reactor gets regulator's nod for loading N-fuel". The Times of India. ISSN 0971-8257. Retrieved 1 August 2024.
  24. ^ "Prototype Fast Breeder Reactor to be operational by end of 2025: Govt". The Economic Times. 4 December 2024. ISSN 0013-0389. Retrieved 8 December 2024.
  25. ^ "India's nuclear regulator approves criticality for Prototype Fast Breeder Reactor". Nuclear Engineering International. 1 August 2024. Retrieved 1 August 2024.
  26. ^ Republic Day Address, BARC Director.
  27. ^ a b Raj, Baldev (30 October 2009). "Design Robustness and Safety Adequacy of India's Fast Breeder Reactor". Science & Global Security. 17 (2–3): 194–196. Bibcode:2009S&GS...17..194R. doi:10.1080/08929880903451397. S2CID 119918317.
  28. ^ "Design of 500 MWe Prototype Fast Breeder Reactor" (PDF). Archived from the original (PDF) on 17 April 2012. Retrieved 17 April 2012.
  29. ^ Busse, J.G. (April 1978). "Slow breeder makes its own nuclear fuel". Popular Science. Vol. 212, no. 4. pp. 89–91, 200, 202.

External links

[edit]
  • "Kalpakkam PFBR to be completed ahead of schedule; 4 more to come up by 2020". The Hindu. 7 September 2005. Archived from the original on 1 February 2008.
  • The design of the Prototype Fast Breeder Reactor, Nuclear Engineering and Design, April 2006
  • v
  • t
  • e
Nuclear power in India
Nuclear reactors
Three-stage nuclear power programme
PHWR
  • IPHWR
    • IPHWR-220
    • IPHWR-540
    • IPHWR-700
FBR
  • FBR-600
  • FBTR
  • PFBR
Thorium
  • AHWR-300
Light Water Reactors
Electricity generation
  • IPWR-900
Nuclear marine propulsion
  • CLWR-B1
  • CLWR-B2
Research reactors
  • CIRUS
  • Dhruva
  • KAMINI
Nuclear power plants
  • Gorakhpur
  • Jaitapur
  • Kaiga
  • Kakrapar
  • Kalpakkam
  • Kovvada
  • Kudankulam
  • Narora
  • Rawatbhata
  • Tarapur
Facilities
  • Bhabha Atomic Research Centre
  • High Altitude Research Laboratory
  • Indira Gandhi Centre for Atomic Research
  • Institute for Plasma Research
  • Nuclear Fuel Complex
  • Raja Ramanna Centre for Advanced Technology
  • Variable Energy Cyclotron Centre
Organisations
  • Atomic Energy Commission of India
  • Atomic Energy Regulatory Board
  • Atomic Minerals Directorate for Exploration and Research
  • Bharatiya Nabhikiya Vidyut Nigam
  • Board of Radiation and Isotope Technology
  • Department of Atomic Energy
  • Heavy Water Board
  • Homi Bhabha National Institute
  • Nuclear Power Corporation of India
  • Indian Rare Earths Limited
  • Uranium Corporation of India
Nuclear tests
  • Smiling Buddha
  • Pokhran-II
Resources
  • Jaduguda uranium mine
  • Tummalapalle uranium mine
Other topics
  • Energy policy of India
  • India–United States Civil Nuclear Agreement
  • Electricity sector
  • Solar power
  • Wind power
  • v
  • t
  • e
Nuclear technology
  • Outline
Science
  • Chemistry
  • Engineering
  • Physics
  • Atomic nucleus
  • Fission
  • Fusion
  • Radiation
    • ionizing
    • braking
Fuel
  • Tritium
  • Deuterium
  • Helium-3
  • Fertile material
  • Fissile material
  • Isotope separation
  • Nuclear material
    • Uranium
      • enriched
      • depleted
    • Plutonium
    • Thorium
Neutron
  • Activation
  • Capture
  • Poison
  • Cross section
  • Generator
  • Radiation
    • Wigner effect
  • Reflector
  • Temperature
  • Thermal
  • Fast
  • Fusion
Power
  • by country
  • Power plant
  • Economics
  • Accidents and incidents
  • Policy
  • Fusion
  • Radioisotope thermoelectric (RTG)
    • MMRTG
  • Propulsion
    • rocket
  • Safety and security
    • Nuclear meltdown
Medicine
Imaging
  • Autoradiograph
  • RadBall
  • Scintigraphy
  • Single-photon emission (SPECT)
  • Positron-emission tomography (PET)
Therapy
  • Fast-neutron
  • Neutron capture therapy of cancer
  • Targeted alpha-particle
  • Proton-beam
  • Tomotherapy
  • Brachytherapy
  • Radiosurgery
  • Radiopharmacology
Processing
  • Atomic gardening
  • Electron-beam processing
  • Food irradiation
  • Gemstone irradiation
Weapons
Topics
  • Arms race
  • Delivery
  • Design
  • Disarmament
  • Ethics
  • Explosion
    • effects
  • History
  • Proliferation
  • Testing
    • high-altitude
    • underground
  • Warfare
  • Yield
    • TNTe
Lists
  • States with nuclear weapons
  • Historical stockpiles and tests
    • Tests
    • Tests in the United States
  • WMD treaties
  • Weapon-free zones
  • Weapons
Waste
Products
  • Actinide
    • Reprocessed uranium
    • Reactor-grade plutonium
    • Minor actinide
  • Activation
  • Fission
    • LLFP
  • Actinide chemistry
Disposal
  • Fuel cycle
  • High-level (HLW)
  • Low-level (LLW)
  • Nuclear decommissioning
  • Repository
  • Reprocessing
  • Spent fuel
    • pool
    • cask
  • Transmutation
Debate
  • Nuclear power
  • Nuclear weapons
  • Blue Ribbon Commission on America's Nuclear Future
  • Anti-nuclear movement
  • Uranium mining
  • Nuclear power phase-out
Nuclear reactors
Fission
Moderator
Light water
  • Aqueous homogeneous
  • Boiling
    • BWR
    • ABWR
    • ESBWR
    • Kerena
  • Natural fission
  • Pressurized
    • AP1000
    • APR-1400
    • APR+
    • APWR
    • ATMEA1
    • CAP1400
    • CPR-1000
    • EPR
    • Hualong One
      • ACPR1000
      • ACP1000
    • VVER
    • RITM-200
      • KLT-40
      • OK-150/OK-900
      • OK-650
    • KN-3
    • VM
    • IPWR-900
    • many others
  • Supercritical (SCWR)
Heavy water
by coolant
D2O
  • Pressurized
    • CANDU
      • CANDU 6
      • CANDU 9
      • EC6
      • AFCR
      • ACR-1000
    • CVTR
    • IPHWR
      • IPHWR-220
      • IPHWR-540
      • IPHWR-700
    • PHWR KWU
    • MZFR
    • R3
    • R4 Marviken
H2O
  • HWLWR
    • ATR
    • HW BLWR 250
  • Steam-generating (SGHWR)
  • AHWR
Organic
  • WR-1
CO2
  • HWGCR
    • EL-4
    • KKN
    • KS 150
    • Lucens
Graphite
by coolant
Water (LWGR)
H2O
  • AM-1
  • AMB-X
  • EGP-6
  • RBMK
  • MKER
Gas
CO2
  • Uranium Naturel Graphite Gaz (UNGG)
  • Magnox
  • Advanced gas-cooled (AGR)
He
  • GTMHR
    • MHR-T
  • UHTREX
  • VHTR (HTGR)
    • PBR (PBMR)
      • AVR
      • HTR-10
      • HTR-PM
      • THTR-300
    • PMR
Molten-salt
Fluorides
  • Fuji MSR
  • Liquid-fluoride thorium reactor (LFTR)
  • Molten-Salt Reactor Experiment (MSRE)
  • Integral Molten Salt Reactor (IMSR)
  • TMSR-500
  • TMSR-LF1
None
(fast-neutron)
  • Breeder (FBR)
  • Integral (IFR)
  • Liquid-metal-cooled (LMFR)
    • OK-550
    • BM-40A
    • VT-1
  • Small sealed transportable autonomous (SSTAR)
  • Traveling-wave (TWR)
  • Energy Multiplier Module (EM2)
  • Reduced-moderation (RMWR)
  • Fast Breeder Test Reactor (FBTR)
  • Dual fluid reactor (DFR)
Generation IV
  • Sodium (SFR)
    • BN-350
    • BN-600
    • BN-800
    • BN-1200
    • CFR-600
    • Phénix
    • Superphénix
    • PFBR
    • FBR-600
    • CEFR
    • PFR
    • PRISM
  • Lead
    • BREST-300
  • Helium gas (GFR)
  • Stable Salt Reactor (SSR)
Others
  • Organic nuclear reactor
    • OMRE
    • Arbus
    • Piqua
  • Aircraft Reactor Experiment
Fusion
by confinement
Magnetic
  • Field-reversed configuration
  • Levitated dipole
  • Reversed field pinch
  • Spheromak
  • Stellarator
  • Tokamak
Inertial
  • Bubble (acoustic)
  • Fusor
    • electrostatic
  • Laser-driven
  • Magnetized-target
  • Z-pinch
Other
  • Dense plasma focus
  • Migma
  • Muon-catalyzed
  • Polywell
  • Pyroelectric
  • Nuclear technology portal
  • Category
  • Commons
Retrieved from "https://teknopedia.ac.id/w/index.php?title=Prototype_Fast_Breeder_Reactor&oldid=1324246017"
Categories:
  • Liquid metal fast reactors
  • Nuclear power in India
  • Indian inventions
Hidden categories:
  • Pages using gadget WikiMiniAtlas
  • CS1 maint: deprecated archival service
  • Articles with short description
  • Short description is different from Wikidata
  • Use Indian English from March 2021
  • All Wikipedia articles written in Indian English
  • Use dmy dates from March 2021
  • Pages using infobox mapframe without shape links in Wikidata
  • Coordinates on Wikidata
  • Nuclear power station articles using Infobox power station
  • Pages using infobox power station with unknown parameters
  • All articles with unsourced statements
  • Articles with unsourced statements from August 2023
  • Wikipedia articles needing clarification from August 2023
  • CS1: unfit URL
  • Pages using the Kartographer extension

  • indonesia
  • Polski
  • العربية
  • Deutsch
  • English
  • Español
  • Français
  • Italiano
  • مصرى
  • Nederlands
  • 日本語
  • Português
  • Sinugboanong Binisaya
  • Svenska
  • Українська
  • Tiếng Việt
  • Winaray
  • 中文
  • Русский
Sunting pranala
url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url url
Pusat Layanan

UNIVERSITAS TEKNOKRAT INDONESIA | ASEAN's Best Private University
Jl. ZA. Pagar Alam No.9 -11, Labuhan Ratu, Kec. Kedaton, Kota Bandar Lampung, Lampung 35132
Phone: (0721) 702022
Email: pmb@teknokrat.ac.id